Zibo zhongsheng gas equipment co.,ltd, zibo zhongsheng mechanism co.,ltd. opened new website, welcome to buy single-stage cold and hot gas furnace, two-stage cooling, hot gas furnace, the company dedicated to new and old customers at home and abroad . 86-533-2902229 86-015966966285
  COLD GAS STATIO
  HOT DETARRING G
  Single-stage ga
  COLD GAS STATIO
  HOT GAS STATION
  TWO STAGE COAL
  Single-stage ga
  Two-stage gas f
  Two-stage gas f
  Single-stage ga
 
products>>  

    

    Decontaminating and cooling pocess of up-stage gas: Up-stage gas fistly gets into electrical detarrer (Ⅰ) whose work temperature is about 90~150℃, in this part , heavy tar and dust are separated. Up-stage gas then gets into indirect cooler , where the gas is cooled to 35~45℃, Firstly, dust is centrifugally separated from down-stage gas and gas temperature is lowered to about 450~550℃; secondly , the gas comes into exhaust heating boiler to recove the gas sensible heat with the temperature dropping to about 200~230℃;thirdly, the gas temperature is dropped to 65~80℃ in forced wind cooler; and finally ,its temperature is lowered to 35~45℃ by circulatory cooling water on indirect cooler. Then the up-stage gas is mixed with up-stage gas and gets into electrical deoiler (Ⅱ) to have a second removing of oil and dust. The gas through dealing is pressed by pressure adder , separated gas moisture by trap for water and finally supply to the user.

hits:5798  add time:2010-3-17 【print】 【backoff  
 
 
 
版权所有(C)淄博中升煤气设备有限公司 煤气发生炉
COPYRIGHT 2008-2009 ZIBO ZHONGSHENG GAS EQUIPMENT CO.,lTD. ALL RIGHTS RESERVED.  技术支持:方圆网络
鲁ICP备07015394号